security and life Basics

Affiliates: 0,18 $ — how to earn
Pay with:
i agree with "Terms for Customers"
Sold: 0
Refunds: 0

Uploaded: 27.02.2016
Content: ОБЖ.rar (50,5 kB)

Description

I suggest to buy a quiz on the subject: "Basics of security and ability to live"
Table of contents:
3. State and public supervision and monitoring of the legislation on occupational safety and health in the enterprise. Responsibility for violation of legislation on occupational safety and health 3
9. Investigation light industrial accidents. The procedure for the formation of the commission, its composition, the necessary documents, the timing of the investigation 9
14. Education and instruction in occupational safety of workers at the enterprise 10
45. Fire. Fire safety. The main causes of fires. Dangerous and harmful factors of primary fire extinguishing agents. Fire extinguishers. Scope of application. 14
Problem №4 18
Task №9 19
References 22
>> Work original (antiplagiat high) <<
Volume: 23 pages
Springs: 20 pieces
There is a footnote
14 size, half interval (GOST-registration)
The work is written in this year
The work was evaluated on the "ex"
This work was his own and is not a copy-paste (borrowing) from the Internet.
At the time of placing the goods on the sale of its originality was at least 50% by Antiplagiat.ru (ETXT-antiplagiat).
Save yourself time, nerves and energy! ;)

Additional information

Task №1:

Determine the annual socio-economic cost of the additional payment of sick leaves due to pollution cement dust in cement unloading of wagons.
Initial data:
• The size of the territory of the cement unloading S, m2 - 250;
• Number of unloaded wagons, N, pcs - 6;
• The total time of discharge wagons t, h - 3.00;
• The average density of people on the cement unloading Np, people / m2 - 0.12;
• Average daily wage per employee Sn, rub. - 26.0;
• The number of sick days per employee per year, D days- 20;
• The maximum rate of natural loss of cement during unloading Kn = 0.15%
• The weight of cement in the car m = 50 m, that is 50,000 kg.

Task №2:

Determine the annual socio-economic cost of the additional payment of sick leaves due to pollution cement dust in cement unloading of wagons.
Initial data:
• Rod soil - clay;
• The depth of pile grounding device HT - 74 cm
• Climate zone - II
• coefficient, which takes into account the influence of climatic zones Y - 1,8 ... 1,3
• The length of the vertical electrode I - 300 cm
• electrode outer diameter d - 6 cm
• The width of the steel strip combining B - 3 cm
• The electrical network with insulated neutral - 380/220
• calculation scheme (type of grounding to take on their own);
• soil resistivity Ptabl - 0.5 • 104 ohm / cm
• allowable grounding resistance Rdop device - 4 OHMS
• coefficient hu use for vertical earthing - 6 pieces - 0.730
• utilization rate for hu earthing strips 6 pcs - 0.48

Feedback

0
No feedback yet.
Period
1 month 3 months 12 months
0 0 0
0 0 0
In order to counter copyright infringement and property rights, we ask you to immediately inform us at support@plati.market the fact of such violations and to provide us with reliable information confirming your copyrights or rights of ownership. Email must contain your contact information (name, phone number, etc.)