Organization and TS under ATP (TLT)

Affiliates: 0,3 $ — how to earn
Pay with:
i agree with "Terms for Customers"
Sold: 0
Refunds: 0

Uploaded: 08.01.2010
Content: 00108195407543.rar (1663,66 kB)
Loyalty discount! If the total amount of your purchases from the seller G.Rasman more than:
31 $the discount is11%
If you want to know your discount rate, please provide your email:

Description

Organization and TS under ATP Tomsk with the detailed design of the power plant engines
TLT

In this thesis project the aim is to develop a production and technical basis for and TS 90 GAZ-66-11 (40ed.) And the Urals 43202 (50ed.).


Introduction 6
1 General Part 8
1.1 SUMMARY 8
1.2 Description of cars Ural-43202 and GAZ-66-11 as the maintenance facilities and maintenance 9
2 The calculation of the annual production program of maintenance and current repair of GAZ-66-11 and Ural-43202 12
2.1 Background 12
2.2 Correcting the path of cars and frequency of TO-1 and TO-13 February
2.2 Adjustments runs Lk, L_ (TO-1) and L_ (TS-2) depending on the average daily mileage of 14
2.3 The number of the CD, and SW for one car per cycle operation before overhaul (N_KR, N_ (TO-1), N_ (TO-2), NEO) 16
2.4 Determination of the transition from cycle to year 17
2.5 Determination of the number of the CD, and SW 19 for a year
2.6 Calculation of the number of diagnostic effects D-1 and D-2 for the year 19
2.7 Determination of daily programs EO TO-1, TO-2, D-1 and D-February 20
2.8 Calculation of the annual volume of works on TO, TP and SW 21
2.9 Distribution of annual labor-intensive TS-1 and TS-2 for types of works 25
2.10 Annual labor input of works on the self-service car-enterprises 26
2.11 The distribution of work on a self-service type 27
2.12 Distribution of guards work by type TP 27
2.13 The distribution of time-consuming work on the TR 28 sites
2.14 Total annual labor input of diagnostic work in the performance of TS-1, TS-2 and TS 29
2.15 Annual labor input diagnostic work D-January 29
2.16 Annual labor input diagnostic work D-February 30
2.17 The average value of time-consuming work required a D-1 post for the calculation of diagnosing 30
2.18 The average value of time-consuming work D-2 posts for the calculation of the required diagnostics 30
2.19 Total annual time-consuming work of EO, TO-1, TO-2, TR and TCAM for the enterprise 31
2.20 The calculation of the number of workers 31
3 Process calculation and design areas WHAT sites and warehouses ATP 36
3.1 Indicators for the design area of \u200b\u200bSW for maintenance of vehicles on the production line continuous 37
3.2 Calculation of indicators for the design of the zone TO-1, with service vehicles on the universal post 40
3.3 Calculation of the design parameters zone TO-2 on universal service at positions 41
3.4 Calculation of indicators for the design of guards work zone TP 42
3.5 Calculation of indicators for the design of specialized posts D-1 and D-2 43
3.6 Calculation of the area of \u200b\u200bproduction sites 44
3.7 Calculation of storage space and 45 residential premises
4 General Arrangement plan of the production building and the organization of works on TO and TR cars on the projected enterprise 48
4.1 General Arrangement plan industrial building 48
4.2. Organization and TS cars on the projected enterprise 51
5 Detailed development of the organization of works at the site of repair equipment supply system 54
5.1 Calculation and selection of equipment 54
5.2 Calculation of energy portion 56
5.3 Description of the sequence of work and technology in the area of \u200b\u200brepair equipment supply system 60
6 Safety and environmental project 65
6.1 Analysis of potential hazards and risks at work in the area of \u200b\u200brepair equipment supply system and the development of mitigation measures 65
7 Development of design tools for otvёrtyvaniya and zavёrtyvaniya studs 68
7.1 Calculation of the screw thread 70 on the wear resistance
7.2 Calculation of the screws on the strength of 72
7.3 Checking the stability of the screw 74
7.4 Calculation of the parameters of the nut 75
7.5 Determination of the handle 77
7.6 Verification calculation ratchet shear 78
7.7 Calculation of the working surfaces of the jaws to collapse 79

Additional information

List files.

Organization and TS under ATP Tomsk with the detailed design of the power plant dvigateley.docx

Frame 15.cdr
Frame 40 on razdely.cdr
The report - to report it.


\\ Drawings notes \\

\\ Figure 4.1 -Organizing TO and TR.cdr
\\ Figure 7.1 - oboznacheniya.docx
\\ Figure 7.1 -Prisposoba.cdr
\\ Figure 7.2 -Rezba.cdr
\\ Figure 7.3 -Rukochtka.cdr
\\ Figure 7.4 -Hrapovik.cdr
\\ Figure 7.5 - Gubki.cdr


\\ Whatman \\ - Drawings

\\ Detalirovka.cdr
\\ Plan of industrial korpusa.cdr
\\ Accommodate vatman.cdr
\\ Specification oborudovaniya.cdr
\\ Specification prisposobleniya.cdr
\\ Technological card on the TO-2 power supply system carburetor dvigatelya.cdr
\\ Plot system instrumentation repair pitaniya.cdr
\\ Eksplikatsiya.cdr


\\ Details separately \\

\\ Screw power 00 08.cdr
\\ Sponge 00 02.cdr
\\ Tapered washer 00 05.cdr
\\ Housing 00 01.cdr
\\ Clip 00 11.cdr
\\ Cork 00 10.cdr
\\ Handle 00 09.cdr
\\ Handle 00 14.cdr

All is in the archive ".rar", all the drawings are drawn in the program "Corel DRAW X3", and the documents in MS Word 2007.
Protected perfectly!

Feedback

0
No feedback yet.
Period
1 month 3 months 12 months
0 0 0
0 0 0
In order to counter copyright infringement and property rights, we ask you to immediately inform us at support@plati.com the fact of such violations and to provide us with reliable information confirming your copyrights or rights of ownership. Email must contain your contact information (name, phone number, etc.)