Graduation Railway Station Reconstruction Project

Affiliates: 1,07 $ — how to earn
Pay with:
i agree with "Terms for Customers"
Sold: 0
Refunds: 0

Uploaded: 16.11.2016
Content: диплом ЖД вокзал.rar (11015,17 kB)

Seller

FuzzAble information about the seller and his items
offlineAsk a question

Seller will give you a gift certificate in the amount of 63 RUB for a positive review of the product purchased..

icon-delivery

Delivery Guaranteed

If you are unhappy with a product you purchased, the seller will return your money within 1 day from the moment of purchase.

Description

The diploma was protected by 5, 2015 in Russia, Abakan. Agricultural Institute. Construction and operation of buildings and structures (SiEZiS)
The project consists of an explanatory note 62 sheet and 5-doc dwg format drawings


 Content:
    introduction
1 Architectural - constructive razdel1.1 dannye1.2 Initial Master Plan uchastka1.3 volumetric - planning resheniya1.4 resheniya1.5 Structural Engineering - technical equipment
2 Settlement - constructive razdel2.1 Collection load 2.2 Calculation of hollow core slabs 2.3 Calculation of foundation base width
3 Technology and Organization Preparatory stroitelstva3.1 period3.2 Excavation construction technology raboty3.3 proizvodstva3.4 Organization of construction proizvodstva3.5 plan3.6 General Building Measures for Occupational Health and Safety construction
     conclusion
     References

The composition of the graphic part:
Page 1 Facade 1-5 after reconstruction, Facade 5-1 after reconstruction, Facade 1-3 to reconstruction; The plan at the level of 0.000 to reconstruction at the level of 0.000 after the reconstruction plan; Legend floors, rooms, buildings and structures; Specification joinery; Rose of Wind; Key indicators of the general plan; General plan of the site; Technical and economic indices of the building.
Page 2 location scheme rafters elements; foundation plan, roof, floors; Section 1-1; The sections of the foundations; Architectural and structural components; Specification of concrete products; Specification woodwork a rafter roof.
Page 3 Ceiling board
Page 4 Flow chart on the above-ground part.
Page 5 The planned schedule; schedule of movement of workers; statement of requirements in building constructions, materials and machines; building master plan; TIC table

Additional information

Introduction:
Currently, there is a need to expand transport links between cities and operated by the building over time accumulate physical and moral deterioration. In today´s rapidly developing world often obsolescence vastly superior physical wear and tear, ie bearing and enclosing structures are still able to perform their functions, but in view of the obsolescence of the building does not meet the requirements of the functional requirements. In such cases, cost-effective to produce the reconstruction of the building, rather than start new construction. This project examined the reconstruction of the railway station building station Minusinsk and increase working space, by extension on the west side of the building. During the reconstruction provides replacement of flat roof with roll roofing, attic gable on a roof of metal.

Feedback

0
No feedback yet.
Period
1 month 3 months 12 months
0 0 0
0 0 0
Seller will give you a gift certificate in the amount of 63 RUB for a positive review of the product purchased..
In order to counter copyright infringement and property rights, we ask you to immediately inform us at support@plati.market the fact of such violations and to provide us with reliable information confirming your copyrights or rights of ownership. Email must contain your contact information (name, phone number, etc.)